
Events have conspired to move the timeline up, so I bit the bullet and got the fence installed. Originally, I wanted a fence with metal posts, but we needed this done quick ‘n’ cheap, so treated pine it is.
The most time-consuming part (for me) was getting the lumber ordered from the Big Box store. I normally would’ve gone with a more local lumberyard, but it was more of a matter of getting it done.
Once the wood was on-side, the guys got it done. Took one day for the fence, and one for the gate.
Yes, that’s a Master Lock. Yes, Master Locks are the absolute worst.
But it’ll have to do for now.
For someone to open the gate, they’ll have to intentionally B&E, and that’s at least something.



